Power Converter Control | How to Use Rapid Control Prototyping to Validate Electric Motors and Power Converters, Part 4
From the series: How to Use Rapid Control Prototyping to Validate Electric Motors and Power Converters
Learn how to test new controls, tune parameters, and log data for a DC-DC converter and a 3-phase grid-tied inverter. Rapid control prototyping (RCP) enables you to:
- Use a real-time target computer instead of the embedded processor
- Generate C and VHDL code from Simulink® models
- Configure I/O and communication protocols from Simulink
Published: 11 Nov 2021
Featured Product
Simulink
Related Videos:
Select a Web Site
Choose a web site to get translated content where available and see local events and offers. Based on your location, we recommend that you select: .
You can also select a web site from the following list
How to Get Best Site Performance
Select the China site (in Chinese or English) for best site performance. Other MathWorks country sites are not optimized for visits from your location.
Americas
- América Latina (Español)
- Canada (English)
- United States (English)
Europe
- Belgium (English)
- Denmark (English)
- Deutschland (Deutsch)
- España (Español)
- Finland (English)
- France (Français)
- Ireland (English)
- Italia (Italiano)
- Luxembourg (English)
- Netherlands (English)
- Norway (English)
- Österreich (Deutsch)
- Portugal (English)
- Sweden (English)
- Switzerland
- United Kingdom (English)
Asia Pacific
- Australia (English)
- India (English)
- New Zealand (English)
- 中国
- 日本Japanese (日本語)
- 한국Korean (한국어)