If I call matlabpool open 4 and I have 4 cores, will I work in parallel with 4 or with 3 workers?
Show older comments
Hi, I have a desktop machine with 4 cores available. 1) I wonder whether, calling a pool of 4 workers with the PCT, there will be 4 workers working in parallel, or just 3 since 1 is the client. 2) Working with a cluster workstation (with MDCS), when I connect to the master node (client), I run my code in parallel calling "n" workers, and I want to compare the simulation time of the parallel computation with that of the sequential one (I want to see the speedup). For the sequential computation, should I call in the master node matlabpool open 1 (calling 1 slave node from the master node) or should I work directly with the master node, than I don't need to call a matlabpool? Thank you in advance.
Accepted Answer
More Answers (1)
Giovanni De Luca
on 12 Jul 2013
0 votes
Categories
Find more on Job and Task Creation in Help Center and File Exchange
Community Treasure Hunt
Find the treasures in MATLAB Central and discover how the community can help you!
Start Hunting!