You are now following this Submission
- You will see updates in your followed content feed
- You may receive emails, depending on your communication preferences
13 unit system is tested.
Best Cost : 17957.634133 $/h
Mean Cost : 18009.858036 $/h
Std : 43.017545
Success Rate (<17964): 3.3%
Power Balance Check (Best Solution):
Total Generated : 1799.999999 MW
Demand (Pd) : 1800.000000 MW
Error : 0.000001000 MW → Acceptable
All 30 runs power balance error:
Max error : 1.00e-06 MW
Mean error: 3.61e-07 MW
All errors < 1e-6? → YES
Best Generation Schedule (MW):
376.868 277.671 254.524 131.633 110.417 111.129 140.346 96.049 90.792 41.522 53.585 56.978 58.486 Sum = 1799.999999
Cite As
A Novel Lyrebird Optimization Algorithm for Enhanced Generation Rate-Constrained Load Frequency Control in Multi-Area Power Systems with Proportional Integral Derivative Controllers
General Information
- Version 1.0.0 (3.28 KB)
MATLAB Release Compatibility
- Compatible with any release
Platform Compatibility
- Windows
- macOS
- Linux
| Version | Published | Release Notes | Action |
|---|---|---|---|
| 1.0.0 |
