nrSpectralFlatness
R2026bSyntax
Description
[
measures the error vector magnitude (EVM) equalizer spectral flatness for uplink allocations
according to 3GPP TS 38.101-1 and TS 38.101-2.metrics,info] = nrSpectralFlatness(carrier,channel,eqGrid,refGrid,Hest)
The function evaluates the peak-to-peak ripple of the equalizer coefficients
independently across Range 1 and Range 2 frequency regions defined by
carrier and channel. It derives EVM equalizer
coefficients using least squares (LS) estimation from the equalized symbols grid
eqGrid and reference symbols grid refGrid. Then,
the function scales these derived coefficients by zero-forcing (ZF) equalizer weights,
computed from the channel estimate Hest to account for
channel-dependent layer gain.
The function returns the ripple values and pass or fail status in
metrics. It returns the equalizer coefficients and range indices in
info. To use this syntax you must have equalized symbols, reference
symbols, and a channel estimate.
[
measures EVM equalizer spectral flatness for uplink allocations from the received grid
metrics,info] = nrSpectralFlatness(carrier,channel,rxGrid)rxGrid. The function performs channel estimation, using demodulation
reference signal (DM-RS) symbols from rxGrid, and constructs equalized
symbols using ZF equalization. It reconstructs the transmitted data symbols from the
equalized data symbols. The function uses the reconstructed symbols as reference symbols.
Then, it derives EVM equalizer coefficients using LS estimation from the equalized and
reference symbols.
[
specifies options using one or more name-value arguments in addition to any combination of
input arguments from the previous syntaxes.metrics,info] = nrSpectralFlatness(___,Name=Value)
Examples
Calculate spectral flatness metrics from an equalized grid, reference grid, and channel estimate. You generate a 5G NR physical uplink shared channel (PUSCH) waveform and add noise to the waveform, performs OFDM demodulation and estimate the channel using demodulation reference signal (DM-RS) symbols. To equalize the received grid and reconstruct reference symbols, you use hard decisions.
To ensure simulation results are repeatable, initialize the random number generator with a fixed seed. For greater statistical accuracy, run the simulation for multiple time with different seeds and compute the average results.
rng(1);
Specify the subcarrier spacing using an nrSCSCarrierConfig object with a resource grid size of 200 resource blocks.
carrierObj = nrSCSCarrierConfig; carrierObj.NSizeGrid = 200;
Specify the bandwidth part configuration with a 20-RB offset from the carrier grid start and a size of 30 resource blocks.
bwpObj = nrWavegenBWPConfig; bwpObj.SubcarrierSpacing = 15; bwpObj.NStartBWP = carrierObj.NStartGrid+20; bwpObj.NSizeBWP = 30;
Create a PUSCH configuration for 5G uplink waveform generation that allocates all 30 PRBs in the bandwidth part.
puschObj = nrWavegenPUSCHConfig; puschObj.PRBSet = 0:29; puschObj.NumLayers = 2;
Configure an uplink carrier for FR1 with a 40 MHz channel bandwidth. Specify 20 subframes to generate a multi-slot waveform for evaluation across multiple measurement intervals.
ChannelBW = 40; NSFrames = 20; cfgUL = nrULCarrierConfig( ... FrequencyRange="FR1", ... ChannelBandwidth=ChannelBW, ... NumSubframes=NSFrames, ... SCSCarriers={carrierObj}, ... BandwidthParts={bwpObj}, ... PUSCH={puschObj});
Generate the uplink waveform using the nrWaveformGenerator function.
[waveform,waveInfo] = nrWaveformGenerator(cfgUL);
Add additive white Gaussian noise (AWGN) to the transmitted waveform to simulate channel noise.
SNRdB = 40; SNR = 10^(SNRdB/10); R = size(waveform,2); N0 = 1/sqrt(2*R*double(waveInfo.ResourceGrids.Info.Nfft)*SNR); noise = N0*complex(randn(size(waveform)),randn(size(waveform))); waveform = waveform + noise;
Create a configuration for a PUSCH for receiver processing using parameters from the PUSCH configuration for waveform generation.
pusch = nrPUSCHConfig; pusch.NSizeBWP = bwpObj.NSizeBWP; pusch.NStartBWP = bwpObj.NStartBWP; pusch.Modulation = puschObj.Modulation; pusch.NumLayers = puschObj.NumLayers; pusch.MappingType = puschObj.MappingType; pusch.SymbolAllocation = puschObj.SymbolAllocation; pusch.PRBSet = puschObj.PRBSet; pusch.NumAntennaPorts = puschObj.NumAntennaPorts; pusch.DMRS = puschObj.DMRS;
Create a carrier configuration for OFDM demodulation and channel estimation using the same carrier and BWP settings used to generate the uplink waveform.
carrier = nrCarrierConfig; carrier.NCellID = cfgUL.NCellID; carrier.NSizeGrid = carrierObj.NSizeGrid; carrier.NStartGrid = carrierObj.NStartGrid; carrier.SubcarrierSpacing = carrierObj.SubcarrierSpacing; carrier.CyclicPrefix = bwpObj.CyclicPrefix; carrier.NSlot = 0;
Perform OFDM demodulation on the received waveform using the nrOFDMDemodulate function. Set the cyclic prefix fraction to 0.5 to align FFT timing to the middle of the cyclic prefix.
samplerate = waveInfo.ResourceGrids.Info.SampleRate; carrierFreq = cfgUL.CarrierFrequency; rxGrid = nrOFDMDemodulate(carrier,waveform, ... CyclicPrefixFraction=0.5, ... SampleRate=samplerate, ... CarrierFrequency=carrierFreq);
Calculate the number of subcarriers, OFDM symbols per slot, and transmission layers from the carrier and channel configuration.
K = carrier.NSizeGrid*12; L = carrier.SymbolsPerSlot; P = pusch.NumLayers; numSlots = NSFrames*carrier.SlotsPerSubframe;
Create the DM-RS reference grid for channel estimation. Extract the DM-RS symbols and DM-RS indices using the nrPUSCHDMRS and nrPUSCHDMRSIndices function respectively.
refGridDMRS = zeros(K,L*numSlots,P); for nSlot = 0:numSlots-1 carrier.NSlot = nSlot; dmrsInd = nrPUSCHDMRSIndices(carrier,pusch); dmrsSym = nrPUSCHDMRS(carrier,pusch); slotGrid = nrResourceGrid(carrier,P); slotGrid(dmrsInd) = dmrsSym; refGridDMRS(:,nSlot*L+(1:L),:) = slotGrid; end
Perform channel estimation using the received grid and DM-RS reference grid.
[H,nVar] = nrChannelEstimate(rxGrid,refGridDMRS);
Perform equalization on the received grid using nrEqualizeMMSE.
H1 = reshape(H,[K*L*numSlots, R, P]); rxFlat = reshape(rxGrid,[K*L*numSlots, R]); eqFlat = nrEqualizeMMSE(rxFlat, H1, nVar); eqGrid = reshape(eqFlat,[K,L*numSlots, P]);
Construct the reference grid by performing hard slicing on the equalized symbols. Demodulate and remodulate the equalized PUSCH symbols to obtain reference symbols for each slot.
refGrid = zeros(K,L*numSlots,P); for nSlot = 0:numSlots-1 carrier.NSlot = nSlot; slotSymbols = nSlot*L + (1:L); dataInd = nrPUSCHIndices(carrier,pusch); dmrsInd = nrPUSCHDMRSIndices(carrier,pusch); dmrsSym = nrPUSCHDMRS(carrier,pusch); eqSlot = eqGrid(:,slotSymbols,:); refSlot = nrResourceGrid(carrier,P); dataSymbols = eqSlot(dataInd); refBits = nrSymbolDemodulate(dataSymbols(:),pusch.Modulation,DecisionType="hard"); ref = nrSymbolModulate(refBits,pusch.Modulation); refSlot(dataInd) = ref; refSlot(dmrsInd) = dmrsSym; refGrid(:,slotSymbols,:) = refSlot; end
Measure EVM and spectral flatness for each slot. Extract the symbols corresponding to each slot, and then compute the EVM and spectral flatness for that slot using the nrEVM and nrSpectralFlatness function, respectively.
evmArray = zeros(numSlots,1); metricsArray = cell(numSlots,1); infoArray = cell(numSlots,1); for nSlot = 0:numSlots-1 carrier.NSlot = nSlot; slotSymbols = nSlot*L + (1:L); EVM = nrEVM(eqGrid(:,slotSymbols,:),refGrid(:,slotSymbols,:)); evmArray(nSlot+1) = EVM; [metrics,info] = nrSpectralFlatness(carrier,pusch, ... eqGrid(:,slotSymbols,:), ... refGrid(:,slotSymbols,:), ... H(:,slotSymbols,:,:), ... k0=0,FrequencyRange=cfgUL.FrequencyRange, ... CarrierFrequency=cfgUL.CarrierFrequency, ... ChannelBandwidth=cfgUL.ChannelBandwidth); metricsArray{nSlot+1} = metrics; infoArray{nSlot+1} = info; end
Display the EVM and spectral flatness results for first slot.
EVM = evmArray(1)
EVM = 0.4237
metrics = metricsArray{1}metrics = struct with fields:
RP1: [0.2868 0.3616]
RP2: [0×2 double]
RP12: [0×2 double]
RP21: [0×2 double]
Pass: 1
info = infoArray{1}info = struct with fields:
EqualizerCoefficients: [2400×2 double]
Range1Indices: [360×1 uint32]
Range2Indices: [0×1 uint32]
To ensure simulation results are repeatable, initialize the random number generator with a fixed seed. For greater statistical accuracy, run the simulation for multiple time with different seeds and compute the average results.
rng(1);
Specify the subcarrier spacing configuration with 30 kHz and a resource grid size of 51 resource blocks.
carrierObj = nrSCSCarrierConfig; carrierObj.NSizeGrid = 51; carrierObj.SubcarrierSpacing = 30;
Specify a bandwidth part configuration that spans the full carrier grid with 30 kHz subcarrier spacing.
bwpObj = nrWavegenBWPConfig; bwpObj.SubcarrierSpacing = 30; bwpObj.NStartBWP = carrierObj.NStartGrid; bwpObj.NSizeBWP = carrierObj.NSizeGrid;
Create a PUSCH configuration for 5G uplink waveform generation with 16-QAM modulation that allocates all 51 PRBs on a single spatial layer.
puschObj = nrWavegenPUSCHConfig;
puschObj.PRBSet = 0:50;
puschObj.NumLayers = 1;
puschObj.Modulation = "16QAM";Create an uplink carrier configuration for FR1 with a 20 MHz channel bandwidth. Specify 10 subframes to generate a multi-slot waveform.
ChannelBW = 20; NSFrames = 10; cfgUL = nrULCarrierConfig( ... FrequencyRange="FR1", ... ChannelBandwidth=ChannelBW, ... NumSubframes=NSFrames, ... SCSCarriers={carrierObj}, ... BandwidthParts={bwpObj}, ... PUSCH={puschObj});
Generate the uplink waveform using nrWaveformGenerator.
[waveform,waveInfo] = nrWaveformGenerator(cfgUL);
Add AWGN to the transmitted waveform to simulate channel noise.
SNRdB = 40; SNR = 10^(SNRdB/10); R = size(waveform,2); N0 = 1/sqrt(2.0*R*double(waveInfo.ResourceGrids.Info.Nfft)*SNR); noise = N0*complex(randn(size(waveform)),randn(size(waveform))); waveform = waveform + noise;
Create a configuration for a PUSCH for receiver processing using parameters from the PUSCH configuration for waveform generation. The nrSpectralFlatness function uses these PUSCH properties to generate DM-RS symbols for channel estimation and determine the allocated resource elements on which it performs equalization.
pusch = nrPUSCHConfig; pusch.NSizeBWP = bwpObj.NSizeBWP; pusch.NStartBWP = bwpObj.NStartBWP; pusch.Modulation = puschObj.Modulation; pusch.NumLayers = puschObj.NumLayers; pusch.MappingType = puschObj.MappingType; pusch.SymbolAllocation = puschObj.SymbolAllocation; pusch.PRBSet = puschObj.PRBSet; pusch.NumAntennaPorts = puschObj.NumAntennaPorts; pusch.DMRS = puschObj.DMRS;
Create a carrier configuration.
carrier = nrCarrierConfig; carrier.NCellID = cfgUL.NCellID; carrier.NSizeGrid = carrierObj.NSizeGrid; carrier.NStartGrid = carrierObj.NStartGrid; carrier.SubcarrierSpacing = carrierObj.SubcarrierSpacing; carrier.CyclicPrefix = bwpObj.CyclicPrefix; carrier.NSlot = 0;
Perform OFDM demodulation with FFT timing aligned to the middle of the cyclic prefix.
rxGrid = nrOFDMDemodulate(carrier,waveform, ... CyclicPrefixFraction=0.5, ... SampleRate=waveInfo.ResourceGrids.Info.SampleRate, ... CarrierFrequency=cfgUL.CarrierFrequency);
Calculate the total number of slots in the received grid.
numSlots = NSFrames*carrier.SlotsPerSubframe;
Measure spectral flatness for each slot using the nrSpectralFlatness function.
metricsArray = cell(numSlots,1); infoArray = cell(numSlots,1); for nSlot = 0:numSlots-1 carrier.NSlot = nSlot; slotSymbols = nSlot*carrier.SymbolsPerSlot + (1:carrier.SymbolsPerSlot); [metrics,info] = nrSpectralFlatness(carrier,pusch, ... rxGrid(:,slotSymbols,:), ... FrequencyRange=cfgUL.FrequencyRange, ... ChannelBandwidth=cfgUL.ChannelBandwidth); metricsArray{nSlot+1} = metrics; infoArray{nSlot+1} = info; end
Display the spectral flatness results for the first slot.
metrics = metricsArray{1}metrics = struct with fields:
RP1: 0.1047
RP2: 0.1031
RP12: 0.0969
RP21: 0.1109
Pass: 1
info = infoArray{1}info = struct with fields:
EqualizerCoefficients: [612×1 double]
Range1Indices: [467×1 uint32]
Range2Indices: [145×1 uint32]
Measure EVM equalizer spectral flatness for a pi/2-BPSK PUSCH waveform. Derive the impulse response from the equalizer coefficients according to TS 38.521-1 Annex E.4.4.2. Then, verify the requirements specified in TS 38.101-1 Section 6.4.2.4.
Note: The example does not model or apply an additional transmitter spectral shaping filter.
To ensure simulation results are repeatable, initialize the random number generator with a fixed seed. For greater statistical accuracy, run the simulation for multiple time with different seeds and compute the average results.
rng(1);
Specify a subcarrier spacing configuration with 15 kHz and a resource grid size of 200 resource blocks.
carrier = nrCarrierConfig; carrier.NSizeGrid = 200; carrier.NStartGrid = 0; carrier.SubcarrierSpacing = 15;
Create a configuration for a PUSCH that uses pi/2-BPSK modulation. Enable transform precoding for DFT-s-OFDM.
pusch = nrPUSCHConfig;
pusch.NSizeBWP = 30;
pusch.NStartBWP = 20;
pusch.Modulation = "pi/2-BPSK";
pusch.PRBSet = 0:pusch.NSizeBWP-1;
pusch.TransformPrecoding = true;Calculate the PUSCH data indices.
[puschIndices,puschInfo] = nrPUSCHIndices(carrier,pusch);
Define a random codeword using the bit capacity of the PUSCH configuration.
cw = randi([0 1],puschInfo.G,1);
Calculate, data symbols, DM-RS indices, and DM-RS symbols for your PUSCH configuration.
puschSym = nrPUSCH(carrier,pusch,cw); puschDMRSInd = nrPUSCHDMRSIndices(carrier,pusch); puschDMRSSym = nrPUSCHDMRS(carrier,pusch);
Construct the transmitted grid.
txGrid = nrResourceGrid(carrier); txGrid(puschIndices) = puschSym; txGrid(puschDMRSInd) = puschDMRSSym;
OFDM modulate the grid to generate the time-domain waveform.
[txWaveform,winfo] = nrOFDMModulate(carrier,txGrid);
Add noise to the transmit waveform.
evmPercent = 2.0; noise = evmPercent/(100*sqrt(winfo.Nfft))*randn(size(txWaveform),like=1i); rxWaveform = txWaveform + noise;
Perform OFDM demodulation with FFT timing aligned to the middle of the cyclic prefix.
rxGrid = nrOFDMDemodulate(carrier,rxWaveform);
Use the DM-RS symbols to create a reference grid to use for channel estimation.
refGrid = zeros(size(rxGrid)); refGrid(puschDMRSInd) = puschDMRSSym;
Calculate the channel estimate using the received grid and reference grid.
[H,nVar] = nrChannelEstimate(rxGrid,refGrid,CyclicPrefix = carrier.CyclicPrefix,CDMLengths = pusch.DMRS.CDMLengths); [rxGrid,refGrid,H] = nrExtractResources(1:numel(rxGrid),rxGrid,refGrid,H);
Perform channel equalization on the extracted PUSCH resource grids.
eqGrid = nrEqualizeMMSE(rxGrid,H,nVar);
Perform hard-decision on the equalized PUSCH symbols to generate the reference symbols.
refBits = nrSymbolDemodulate(eqGrid(puschIndices),pusch.Modulation,DecisionType="hard");
ref = nrSymbolModulate(refBits,pusch.Modulation);Create the reference grid by placing the reference data symbols on the allocated PUSCH resource elements.
refGrid(puschIndices) = ref;
Calculate the spectral flatness metric using the nrSpectralFlatness function, additionally returning the equalizer coefficients.
[metrics,info] = nrSpectralFlatness(carrier,pusch,eqGrid,refGrid,H);
For pi/2-BPSK, the equalizer coefficients capture the combined frequency response of the transmitter, including the spectral shaping filter. Following TS 38.521-1 Annex E.4.4.2, derive the spectral shaping filter impulse response from the equalizer coefficients. Extract the equalizer coefficients over the allocated bandwidth part and compute the inverse frequency response. Apply an inverse FFT to obtain the corresponding impulse response.
M = pusch.NSizeBWP*12; bwpSCs = (pusch.NStartBWP)*12 + (1:M); EC_f = info.EqualizerCoefficients; EC_alloc = EC_f(bwpSCs,:); H_inv = 1./EC_alloc; a_tau = ifft(H_inv,M);
Normalize the impulse response with respect to its zero-delay tap.
a_tilde = a_tau/a_tau(1);
Verify that the normalized impulse response satisfies the spectral shaping filter requirements defined in TS 38.101-1 Section 6.4.2.4. The peak magnitude must occur at the zero-delay tap. The magnitude of each remaining tap must be at least 15 dB below the peak.
peakAtZero = all(abs(a_tilde(1)) >= abs(a_tilde(2:end)))
peakAtZero = logical
1
a_tilde_dB = 20*log10(abs(a_tilde)); sidelobeLevels = a_tilde_dB(2:end-1); below15dB = all(sidelobeLevels < -15)
below15dB = logical
1
Input Arguments
Carrier configuration parameters for a specific OFDM numerology, specified as an
nrCarrierConfig object. This
function uses only these properties of the object:
Physical uplink shared channel configuration, specified as an nrPUSCHConfig object. This
function uses only these properties of the object:
Received OFDM symbols grid, specified as a K-by-L-by-R complex-valued array.
K is the number of subcarriers, equal to
carrier.NSizeGrid*12.L is the number of OFDM symbols per slot.
R is the number of receive antennas.
Data Types: double | single
Complex Number Support: Yes
Estimated channel information, specified as a K-by-L-by-R-by-P complex-valued array or NRE-by-R-by-P complex-valued array.
K is the number of subcarriers, equal to
carrier.NSizeGrid*12.L is the number of OFDM symbols per slot.
NRE is the number of resource elements, equal to K × L.
R is the number of receive antennas.
P is the number of transmitted layers.
Data Types: double | single
Complex Number Support: Yes
Reference symbols grid, specified as a K-by-L-by-P complex-valued array or an NRE-by-P complex-valued matrix. The grid must not exceed one slot duration.
K is the number of subcarriers, equal to
carrier.NSizeGrid*12.L is the number of OFDM symbols per slot.
NRE is the number of resource elements, equal to K × L.
P is the number of transmitted layers.
Note
The dimensions of the eqGrid and refGrid
arguments must be the same.
Data Types: double | single
Complex Number Support: Yes
Equalized OFDM symbols grid, specified as a K-by-L-by-P complex-valued array or an NRE-by-P complex-valued matrix.
K is the number of subcarriers, equal to
carrier.NSizeGrid*12.L is the number of OFDM symbols per slot.
NRE is the number of resource elements, equal to K × L.
P is the number of transmitted layers.
Note
The dimensions of the eqGrid and refGrid
arguments must be the same.
Data Types: double | single
Complex Number Support: Yes
Name-Value Arguments
Specify optional pairs of arguments as
Name1=Value1,...,NameN=ValueN, where Name is
the argument name and Value is the corresponding value.
Name-value arguments must appear after other arguments, but the order of the
pairs does not matter.
Example: nrSpectralFlatness(carrier,channel,rxGrid,FrequencyRange="FR1",ChannelBandwidth=10)
specifies to use NR frequency range 1 and a channel bandwidth of 10 MHz.
NR frequency range, specified as one of these values.
"FR1"— Frequency range 1 (FR1) that corresponds to frequencies from 410 MHz to 7.125 GHz."FR2"— Frequency range 2 (FR2) that corresponds to frequencies from 24.25 GHz to 52.6 GHz (FR2-1) and from 52.6 GHz to 71 GHz (FR2-2).
Data Types: char | string
Frequency offset index in subcarriers relative to Point A, specified as a nonnegative integer. Point A defines the common reference point for resource block grids. The function defines carrier positions relative to Point A. The function uses this offset to determine absolute frequency positions for Range 1 and Range 2 boundaries.
Example: k0=10, specifies a frequency offset of 10 subcarriers
from Point A.
Data Types: double | single
Channel bandwidth in MHz, specified as a positive scalar. Standard channel bandwidths defined in TS 38.101-1 and TS 38.101-2 are:
FR1 —
3,5,10,15,20,25,30,35,40,45,50,60,70,80,90, or100FR2 —
50,100,200,400,800,1600, or2000
The function accepts any positive channel bandwidth value.
When you set this argument to [], the function derives the
channel bandwidth from carrier.NSizeGrid and
carrier.SubcarrierSpacing.
Data Types: double | single
Frequencies of lower and upper edge of operating band in MHz, specified as a two-element vector of the form [FUL_Low FUL_High], as defined in Table 5.5-1 of TS 38.101-1.
When you specify band edges, the function calculates the
ChannelBandwidth as
FUL_High –
FUL_Low and ignores the
ChannelBandwidth argument. If you specify this argument, you
must also specify the CarrierFrequency argument.
Dependencies
To use this name-value argument, you must specify the
FrequencyRange argument as "FR1".
Data Types: double | single
Carrier frequency, specified as a nonnegative scalar. For FR1, when you specify
BandEdges, the CarrierFrequency value
determines the location of the carrier within the operating band. When you specify
BandEdges, you must also specify
CarrierFrequency as a frequency within the bounds specified by
BandEdges. Units are in Hz.
Data Types: double | single
DC subcarrier location for the carrier, specified as one of these values:
[]— The function includes all subcarriers in the measurement.Nonnegative integer — The function excludes the subcarrier at the specified location from the spectral flatness measurement.
You can use this argument when the transmitter has a DC offset that affects the measurement.
Example: TxDirectCurrentLocation=312 excludes subcarrier 312
from the measurement.
Dependencies
To use this name-value argument, you must specify the
rxGrid argument.
Data Types: double | single
Tolerance limit for the ripple measurements in dB, specified as a nonnegative scalar. This value defines how much the measured ripple can exceed the limit defined by TS 38.101-1 and 38.101-2 before the function reports a failure. The function reports a failure only when the measured ripple exceeds the defined limit by more than this value. Units are in dB.
Example: TestTolerance=0.5 adds 0.5 dB margin to all ripple
limits.
Data Types: double | single
Flag for extreme measurement conditions, specified as a numeric or logical
1 (true) or 0
(false).
false— Normal measurement conditions. The function applies the standard ripple limits for normal conditions as defined in TS 38.521-1 and TS 38.521-2.true— Extreme measurement conditions. The function applies the relaxed ripple limits for extreme conditions as defined in TS 38.521-1 and TS 38.521-2.
Data Types: logical
Frequency regions that belong to Range 1 and Range 2, specified as a positive scalar. This argument partitions the carrier bandwidth into Range 1 and Range 2. Units are in MHz.
For FR1 — Range 1 consists of subcarriers that are at least
XMHz away from both band edges. Range 2 consists of subcarriers withinXMHz of either band edge.For FR2 — Range 1 consists of subcarriers within
XMHz of the channel center. Range 2 consists of subcarriers outside this region.For pi/2‑BPSK modulation — Range 1 consists of subcarriers within
XMHz of the bandwidth part (BWP) center. Range 2 consists of subcarriers outside this region.
When you set this argument to [], the function
determines X from the specified frequency range and modulation scheme:
FR1 — The function sets X to 3 MHz. When
IsExtremeConditionis true, the function setsXto 5 MHz.FR2 — The function sets
Xto 30% of theChannelBandwidthvalue, measured from the channel center.pi/2-BPSK — The function sets
Xto 25% of the BWP bandwidth, measured from the BWP center.
Example: nrSpectralFlatness(carrier,channel,rxGrid,FrequencyRange="FR1",X=5)
specifies that subcarriers within 5 MHz of either band edge belong to Range 2, and the
remaining subcarriers belong to Range 1.
Data Types: double | single
Output Arguments
Spectral flatness metrics, returned as a structure containing these fields:
| Field | Value | Description |
|---|---|---|
RP1 | Numeric vector of size 1-by-P | Maximum peak-to-peak ripple of equalizer coefficients in Range 1, in dB. |
RP2 | Numeric vector of size 1-by-P | Maximum peak-to-peak ripple of equalizer coefficients in Range 2, in dB. |
RP12 | Numeric vector of size 1-by-P | Relative difference between the maximum equalizer coefficient in Range 1 and the minimum equalizer coefficient in Range 2, in dB. |
RP21 | Numeric vector of size 1-by-P | Relative difference between the maximum equalizer coefficient in Range 2 and the minimum equalizer coefficient in Range 1, in dB. |
Pass | Logical scalar | Logical output that indicates whether the spectral flatness requirements are satisfied across all layers. |
The function returns Pass as true when all
ripple values satisfy specification limits, including
TestTolerance.
Data Types: Struct
Spectral flatness processing information, returned as a structure containing these fields:
| Field | Value | Description |
|---|---|---|
EqualizerCoefficients | Complex-valued matrix of size K-by-P | Equalizer coefficients per subcarrier per layer. For
pi/2-BPSK modulation, use these coefficients to evaluate
the shaping filter response. |
Range1Indices | Column vector | Indices of subcarriers that fall into Range 1. |
Range2Indices | Column vector | Indices of subcarriers that fall into Range 2. |
Data Types: struct
More About
EVM equalizer spectral flatness quantifies the frequency response variation of a UE transmitter across its allocated uplink bandwidth. An ideal transmitter produces equalizer coefficients of equal magnitude at every subcarrier. In practice, transmitters introduce variation due to analog filter passband ripple, DAC sinc roll-off, power amplifier gain slope, and I/Q imbalance, causing the equalizer coefficient magnitude to vary across subcarriers. The EVM equalizer spectral flatness measures this variation as the maximum peak-to-peak ripple of the equalizer coefficients (in dB) across the allocated uplink block.
The nrSpectralFlatness function derives equalizer coefficients using least
squares (LS) estimation over the allocated uplink bandwidth for each subcarrier
k and layer p independently using this equation:
where MS is the measured symbols from the equalized grid,
NS is the nominal symbols from the reference grid, and
"*" denotes complex conjugation. f denotes the
subcarrier index and t denotes the OFDM symbol index.
The function partitions the allocated bandwidth into Range 1 and Range 2, then evaluates ripple independently in each range.
The partitioning depends on frequency range and modulation:
FR1 — Range 2 consists of subcarriers within
XMHz of either operating-band edge,FUL_LoworFUL_High. Range 1 consists of subcarriers betweenFUL_Low+XandFUL_High–X. The default value ofXis 3 MHz for normal conditions and 5 MHz for extreme conditions.
For the FR1 limits shown in the figure, ripple limit values outside the parentheses apply under normal conditions and values inside the parentheses apply under extreme conditions. For example, 8(12) dBp-p indicates an RP2 limit of 8 dB peak-to-peak under normal conditions and 12 dB peak-to-peak under extreme conditions.
The figure shows only one side of the operating band. The spectral flatness distribution on the opposite side of the operating band is symmetric about the operating-band center frequency.
FR2 — The frequency axis folds about the carrier center frequency. Each subcarrier maps to the axis by its absolute distance from the center,
|FUL_Meas — Fcenter|. Range 1 contains subcarriers withinXMHz of the carrier center frequency, includingXMHz. Range 2 contains the remaining subcarriers up to the band edges. By default,Xis 30% of the channel bandwidth.
The figure shows only one side of the carrier. The spectral flatness distribution on the opposite side of the carrier is symmetric about the carrier center frequency.
pi/2-BPSK — The frequency axis folds about the BWP center frequency. Each subcarrier maps to the axis by its absolute distance from the BWP center frequency. Range 1 consists of subcarriers within
XMHz of the BWP center frequency. Range 2 consists of the remaining subcarriers up to the BWP edges. By default,Xis 25% of the BWP bandwidth. According to TS 38.101‑1 Table 6.4.2.4.1‑1, the peak-to-peak limit is 6 dB for Range 1 and 14 dB for Range 2.
The figure shows only one side of the BWP. The spectral flatness distribution on the opposite side of the BWP is symmetric about the BWP center frequency.
For single-layer transmission, the spectral flatness is the peak-to-peak ripple of |ECp(f)|, in dB. For uplink MIMO transmission, ZF equalization separates the layers using the pseudo inverse of the effective channel matrix:
where is the P-by-R effective channel matrix at subcarrier f, averaged over OFDM symbols. The pth row of GZF(f) specifies how the R received antenna signals are combined to recover layer p. Because the channel is frequency-selective, this row has different magnitudes at different subcarriers. The LS coefficient ECp(f) therefore reflects both the transmitter frequency response and the frequency-dependent ZF gain. To extract only the transmitter contribution, the function multiplies |ECp(f)| by the Euclidean norm of the pth row of GZF(f), producing the spectral flatness coefficient cp:
For 2-Layer uplink MIMO —
For 4-Layer uplink MIMO —
where gp,r are elements of the pth row of GZF, and r is the receive antenna index.
3GPP TS 38.101-1 Annex F.10 defines this ZF scaling procedure for uplink MIMO. For single-layer transmission, Annex F.4 defines the spectral flatness without separate ZF scaling. This function applies GZF uniformly to both cases, treating single-layer as a 1-by-1 MIMO configuration. The results are equivalent because GZF reduces to a scalar inverse for a single receive antenna and a single transmitted layer.
References
[1] 3GPP TS 38.101-1. “NR; User Equipment (UE) radio transmission and reception; Part 1: Range 1 Standalone.” 3rd Generation Partnership Project; Technical Specification Group Radio Access Network.
[2] 3GPP TS 38.101-2. “NR; User Equipment (UE) radio transmission and reception; Part 2: Range 2 Standalone.” 3rd Generation Partnership Project; Technical Specification Group Radio Access Network.
[3] 3GPP TS 38.521-1. “NR; User Equipment (UE) radio transmission and reception; Part 1: Range 1 Standalone.” 3rd Generation Partnership Project; Technical Specification Group Radio Access Network.
[4] 3GPP TS 38.521-2. “NR; User Equipment (UE) radio transmission and reception; Part 2: Range 2 Standalone.” 3rd Generation Partnership Project; Technical Specification Group Radio Access Network.
Extended Capabilities
C/C++ Code Generation
Generate C and C++ code using MATLAB® Coder™.
GPU Code Generation
Generate CUDA® code for NVIDIA® GPUs using GPU Coder™.
Version History
Introduced in R2026b
See Also
Functions
Objects
MATLAB Command
You clicked a link that corresponds to this MATLAB command:
Run the command by entering it in the MATLAB Command Window. Web browsers do not support MATLAB commands.
Select a Web Site
Choose a web site to get translated content where available and see local events and offers. Based on your location, we recommend that you select: .
You can also select a web site from the following list
How to Get Best Site Performance
Select the China site (in Chinese or English) for best site performance. Other MathWorks country sites are not optimized for visits from your location.
Americas
- América Latina (Español)
- Canada (English)
- United States (English)
Europe
- Belgium (English)
- Denmark (English)
- Deutschland (Deutsch)
- España (Español)
- Finland (English)
- France (Français)
- Ireland (English)
- Italia (Italiano)
- Luxembourg (English)
- Netherlands (English)
- Norway (English)
- Österreich (Deutsch)
- Portugal (English)
- Sweden (English)
- Switzerland
- United Kingdom (English)