how to run Model predictive controller in parallel with another model

1 view (last 30 days)
Hello,
so i have a dc microgrid model and i have a model predictive controller using simulink in Matlab, and i want to run the model predictive controller with the microgrid model but i don't know how to do that, because in MPC you have to import signals from the microgrid model into the MPC first, so how to run the 2 together at the same time?
I will show a picture of what i am takling about
thanks in advance

Accepted Answer

madhan ravi
madhan ravi on 9 Jan 2024

More Answers (0)

Categories

Find more on Model Predictive Control Toolbox in Help Center and File Exchange

Products


Release

R2023b

Community Treasure Hunt

Find the treasures in MATLAB Central and discover how the community can help you!

Start Hunting!