Cummulative Summing in Simulink

4 views (last 30 days)
A-Rod
A-Rod on 5 Jun 2024
Commented: A-Rod on 5 Jun 2024
Hello community.
I am trying to do cumulative summing in Simulink, which I beleive creates a a loop. Can anyone
recommend how I accomplish it?
input signal ---> SUM BLOCK ----> output
0.2 0.2
0.3 0.5
0.1 0.6
0.5 1.1
0.7 ---> SUM BLOCK ---> 1.8
0.8 2.6
0.3 2.9
0.6 3.5
any feedback will be highly appreciated

Accepted Answer

Andres Adam
Andres Adam on 5 Jun 2024
Hi A-Rod, you are right: we usually need a loop in this situation. A cumulative sum is usually done with a "memory" block like this:
I am using the 8 values you provided as an example.
I have seen other solutions such as using a "unit delay" block, integrator blocks, and the dedicated "Cumulative sum" block from the DSP System Toolbox.
I recommend paying attention to the time. When should the cumulative sum be performed? I changed my solver settings to take discrete steps at 1 second. Be careful to not run into issues where you are summing the same value more than once.
  1 Comment
A-Rod
A-Rod on 5 Jun 2024
this is what I was looking for, thanks a lot for sharing and for furhter explanation.

Sign in to comment.

More Answers (0)

Tags

Products

Community Treasure Hunt

Find the treasures in MATLAB Central and discover how the community can help you!

Start Hunting!