Dear all,
I have 2 questions please.
I'm currently building a Hybrid Power System (in Simulink & SimPowerSystems) with real world wind, and targeted building values. Both wind speed and power demand of the building is in TimeSeries format.
Unfortunately, I can't find the correct way to implement the varying load correctly. I have tried 2 methods: Using the 3-phase Dynamic Load block, and by basically subtracting the load demand from power generated (P_gen - P_demand = P_difference)
1. How do i implement a varying load demand with simulink blocks? 2. If i just basically subtract load demand from power generated, what do I end my system with? Doing this no longer allows me to end my system with a load block. So in my system with AC-DC Link-AC converter, my output from that goes no where. I'm not too sure of putting a 3-phase dynamic power supply to model a grid is what I should do as the building i chose is taken off grid.
Please help. Ping me for clarification if need be. Thank you.
1 Comment
Direct link to this comment
https://in.mathworks.com/matlabcentral/answers/48697-varying-power-demand-with-timeseries-data-ending-a-system#comment_373743
Direct link to this comment
https://in.mathworks.com/matlabcentral/answers/48697-varying-power-demand-with-timeseries-data-ending-a-system#comment_373743
Sign in to comment.