Hello everone,
Here, line 4 and 5 is called 5525575680 times and they last 280 and 230 seconds in order. May I speed it up, how can I use it more efficient ?
1 function [utilization] = totalUtilization(myArray, periodNumber, count, LPP)
2 duration = 0;
3 for i = 1:count
4 duration = duration + myArray(periodNumber, i);
5 end
6 utilization = duration / LPP;
7 end
Thanks in advance.
  1 Comment
cglr
cglr on 16 Nov 2019
Because, I still can't get used to ability of MATLAB :) .
You are exactly true and no need to loop for sum or etc. I wrote the function taking into account to your comment:
utilization = sum(myArray(periodNumber,:)) / LPP;
Thank you so much.

Sign in to comment.

Accepted Answer

Daniel M
Daniel M on 16 Nov 2019
Edited: Daniel M on 16 Nov 2019
Why do you need a loop to compute a sum? Just replace the entire function with
utilization = sum(myArray(periodNumber, 1:count)) / LPP;
And if count is equal to the number of columns of myArray, replace "1:count" with just ":" to avoid making an extra temporary index.
If periodNumber happens to be a vector, then include the number 2 as the dimension input into sum.
  4 Comments
cglr
cglr on 17 Nov 2019
actually table is a regular array with the size (period,telCount). And I can ask the question in a better way as seen below:
x = zeros(period,1);
for i=1:period
x(i,1) = sum(table(i,1:telCount));
end
Here what I want is, sum all column for each row and write result to x array.
Daniel M
Daniel M on 17 Nov 2019
You really enjoy writing loops! But you don't need to. Look up the documentation for the sum function. It shows you how to do just that.

Sign in to comment.

More Answers (0)

Categories

Find more on Loops and Conditional Statements in Help Center and File Exchange

Community Treasure Hunt

Find the treasures in MATLAB Central and discover how the community can help you!

Start Hunting!